Solution
Bridge Eco Classroom designed the exact building the customer specified. The building was manufactured from Structural Insulated Panels, with 125mm panels for walls and 175mm for the floor and ceiling, which meet the current building regulations.
The external cladding was Western Red Cedar as originally specified. As the building would conform to building control, Aluminium double doors to the front elevation we supplied and fitted along with UPVC anthracite grey fixed and opening windows.
Internally the classroom was plasterboard and skim to all walls and ceiling.
The internal floor finish was commercial graded laminate flooring with skirting board to suit.
Our electrical package consisted of down lights to provide plenty of light, power sockets and consumer unit.
To conform to building regulations an air conditioning for heating and cooling unit was installed throughout the structure.
To the front elevation the structure was complete with a Thermowood veranda, staircase and painted anthracite grey hand rail to match the building.