Solution
Excavation works begun for the foundation contractors to be instructed. A Swift foundation system was found to be the best solution for this build.
The overall Classroom was to measure 17m x 7m and would be manufactured using SIP Panels (Structural Insulated Panels), which conform to building regulations, 125mm SIPS were used in the floor and walls, with 175mm SIPS used for the roof structure.
Externally the classroom was clad with Western Red Cedar. One obvious advantage of cedar cladding is that it is a natural product and a sustainable product. This means that if you use it you are protecting the environment and reducing the carbon footprint of your building.
Our eco classrooms come complete with Aluminium double doors, with an option of bi-fold. For this build we supplied double doors. UPVC windows installed in our standard anthracite grey colour to match the powder coated aluminium doors.
Standard roofing would be box profile roof sheets, with a UPVC guttering system to the rear.
As standard all classrooms are finished internally with plasterboard skim finish to all walls and ceilings. Internal decoration can be included at an additional cost.
Flooring options are commercial grade flooring, commercial grade carpet tiles, with option of vinyl to the kitchen and bathroom areas.
Our standard electrical package consist of downlights, quantity is appropriate for the size of the building, power sockets, again this is discussed prior to installation to ensure the school are happy with the quantity. Heating is discussed prior to installation, and in most cases to conform to building control, SBEM cal’cs along with Air conditioning is required. Air conditioning is the preferred solution and was installed at St Ambrose.
A stunning Classroom manufactured at St Ambrose, we wish the school and children many of happy years in their new facility.